October 2005:

First foreign (NZ) carrier engine inducted.


September 2005:

JTS becomes a CFR14 FAR Part 145 Foreign Repair Station (J90Y234Y) with limited ratings for airframe, engines and specialised services. See operations specifications for details.


August 2005:

FAA Overseas Repair Station audit conducted.

JTS Test Cell construction completed. Shakedown and correlation runs successful for CFM56-3 and CF6-80C2.


8th April 2005

JTS inducts first CF6-80C2 customer engine.


12